In this week, is the scary week for me and all final year project 2 student. The student need to be assess or present their own project by the assessor, one from lecturer and one from industry it depend on the schedule that have been set. The assess will begin from 8.00 a.m - 12.00 p.m and the time given to the student is one student in about 1 hours. The assessor will assess the functionality of project, poster, confident level, attire and the achievement of the project. picture below show when the presentation is finish and Alhamdulillah it is done.
Wednesday, April 25, 2018
Tuesday, April 17, 2018
WEEK 13 (PREPARATION FOR PRESENTATION)
In this week all final year project student need to prepare a poster to present on the next week. before the poster has been printed the poster should be approved by the supervisor. The poster should have a Tittle of the project, student name, student I/D, objective, project description, methodology, flowchart, result, conclusion and reference. Figure 8 below shown the poster of Development of Window Cleaning Robot.
Figure 8: Poster of Development of Window Cleaning Robot.
Wednesday, April 11, 2018
WEEK 12 (GANNT CHART FYP 2)
In this week, I plan to complete the gantt for final yeay project 2. Table below shows a Gantt chart for FYP 2, in week one, all the component that requires constructing project circuit are listing. In week two, the entire component that requires constructing project circuit has been buying. In week three and week four, the discussion with lecturer is set to discuss about the project. In week five until week seven, the hardware component is processing. In week eight and fifteen, the test function of the circuit needs to be made to search if the construct is functional or not. Also In week eight until week fifteen, the troubleshooting problem to be made if the circuit has a problem or not. During that time, the circuit can be fixed to solve the problem. In week sixteen, the projects need to be present and viva in front of the assessor which is one from the lecture that has been set and one from the person that working in a company and need to determine if the project circuit is done successfully or not. In week seventeen, after the project has been presented and viva, the report to make and have to submit to the supervisor.
Gantt Chart Final Year Project 2
No
|
Task
|
Week
|
||||||||||||||||
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
||
1
|
Component
Listing
|
|||||||||||||||||
2
|
Purchase Component
|
|||||||||||||||||
3
|
Discussion With Lecturer
|
|||||||||||||||||
4
|
Hardware Component
|
|||||||||||||||||
5
|
Test
Functional
|
|||||||||||||||||
6
|
Troubleshooting Problem
|
|||||||||||||||||
7
|
Presentation and Viva of Project
|
|||||||||||||||||
8
|
Report
Submission
|
Wednesday, April 4, 2018
WEEK 11 (TROUBLESHOOTING CIRCUIT)
On this week there is to troubleshoot the problem. Firstly, after the test has done and all the component is working good except two things there is Motor pump and wheel are not working well and need to troubleshoot. Then, after troubleshooting has been done, the Motor wheel is working pretty well but the Motor pump still not working well. The Motor pump not working well is because the robot is too weight to lift up the robot and sticky on the window but the cleaning part is good and success to clean. Below there is a video that shows the robot in a good condition except for the motor pump.
Final Testing